Case study – HPS built 3 new houses for sale after purchasing land near Durham City.
The 4 bedroom detached houses were constructed to the highest standard and included custom kitchens, bathrooms and sun rooms.
All building works were carried out including joinery, brickwork, plastering, decorating, electrical works, plumbing and roofing.
Due to the ground conditions, the properties had piled foundations.
Completed house
2nd house
Rear view showing sun room with leaded roof and bridge over stream.
Piling rig on site at outset of works
Construction in progress
Building work in progress
May 11 2014
The entire ground floor of this residential detached listed building was flooded resulting in extensive remedial works being required. After stripping out the damaged areas, the property was dried before HPS started reinstating to its previous condition.
Due to its listed status a sympathetic approach was taken as the works comprised, replacement timber floors, plastering, electrical and plumbing works including replacing an oil fired boiler and Aga range cooker; renewing the custom built kitchen as well as full redecoration.
Previous repairs unrelated to the flooding had blocked off airbricks to the perimeter walls thus, preventing ventilation to the floor void which was causing a separate problem. Hps installed new periscopic vents within the solid brick walls to increase ventilation to the floor void and resolve a potential long term issue.
Kitchen after strip out. Driers installed.
View into kitchen after reinstatement complete with new natural stone floors.
New Aga range type oven
Lounge stripped out and drying above with completed room shown below
Sitting room shortly after flood.
Sitting room after repairs.
Enter your contact phone number in the box below and we’ll call you back to discuss how we can help.